KEBUMEN - The implementation of pipe installation using the drilling method was carried out by IKG at the Entrance of Kebumen Terminal, Jl. Raya Sawahan, Kebumen Regency, Central Java (28/10/2020).
The activity phase begins with the excavation of workholes and targeted holes, then drilling and withdrawing casing pipes and production pipes.
This activity is carried out after all work drawings are approved and supervised directly by Pertamina.